Harris Plant (Green Level Sub) 230kV

Client: Duke Energy

Location: Wake County, NC

Length: 2000 ft

Completion: February 2019 – May 2019

Scope/Description:

  • Relocation of existing 230kV line south of Green Level 230kV substation to accommodate a second bank that required new tap lines and additional clearance for the middle switch
  • Two existing switches were replaced by three 3000A switches to improve system reliability
  • Reinforced concrete foundations and concrete anchors were required for the tap lines

Hightlight: Crews constructed a temporary bypass line consisting of 5 structures to allow the installation of new tap lines.

Trusted experts building powerful solutions.

Our Mission, Vision and Values guide and align us to being the contract of choice in all markets we enter. With over 2500 pieces of owned construction equipment, our capabilities are limitless. The Forbes Bros. Group of Companies shows up ready to deliver with 40 years of experience behind us.