Micaville 115kV Substation Rebuild
Client: Duke Energy
Location: Micaville, NC
Length: 21 miles
Completion Date:October 2018
Scope/Description:
- Removal of existing wooden structures and anchors, circuit switcher, 115kV copper bus and insulators, and 12kV capacitor banks
- Removal and modifications to existing substation infrastructure including: oil containment walls, catch basins, substation fencing, transformers, battery box and relay cabinet.
- Installation of new steel single pole and dead-end structures, underground feeder structure, disconnect and bypass switches, and circuit breakers.