North Foothills Transmission Project – 240 kV & 138 kV
Client: SNC Lavalin T&D
Length: 45 km
Completion Date: June 2015
Location: Alberta, Canada
Scope/Description:
- 154 structures consisting of steel lattice towers, steel monopoles, and wooden H-frame structures
- Double circuit, twin bundle 1033 Curlew ACSR and 13 km section of triple circuit, twin bundle 1033 Curlew
- Salvage 14 km of existing wood H-frame line and 3km of steel lattice tower line
- Helicopter and conventional crane erection
- Cast-in-place concrete piles, helical piles, and direct embedment
Highlight:
As part of Altalink’s Foothills Area Transmission Development this project provides transmission reinforcement and improved reliability for infrastructure that was originally built in 1985.