Pasqua to Swift Current 230kV New Line Construction
Client: SaskPower
Length: 53 km
Completion Date: March 2019
Location: Swift Current, SK
Scope/Description:
- 182 galvanized steel H-frame and monopole structures
- Twin bundle, 795 ACSR Drake and two ½” OHSW
- 221 direct embedment foundations with 141 culverts, and 23 screw piles (subcontracted)
- Line crossings over existing 138kV line and a distribution line
Highlight:
Work was completed in environmentally sensitive areas where crews were required to utilize wash stations.