Bodo Substation 46-12.47kV

Client: LaPlata Electric Association

Location: Durango, CO

Completion: April 2018 – July2018

Scope/Description:

  • Upgrade existing 600A equipment to 1200A
  • Replace circuit breakers, vee-switches, hook-stick switches, surge arresters, and voltage transformers
  • Installation and termination of all control and power cables specified.
  • FB Timberline