Bodo Substation 46-12.47kV
Client: LaPlata Electric Association
Location: Durango, CO
Completion: April 2018 – July2018
Scope/Description:
- Upgrade existing 600A equipment to 1200A
- Replace circuit breakers, vee-switches, hook-stick switches, surge arresters, and voltage transformers
- Installation and termination of all control and power cables specified.
- FB Timberline