Casa Mesa Substation

Client: Blattner Energy

Location: House NM

Project Date: June 2018 – November 2018

Scope/Description:

Retrofit to the existing 34.5 to 345 KV substation to receive new wind farm circuits. Equipment installed included control building, switches, cap banks, MODs, CT/PT Combos, battery building (over 150 batteries).

FB Titan