Birchill Canada Upgrade
Client: Fortis Alberta
Location: Nordegg, AB
Completion: January 2018 – June 2018
Scope/Description:
- Rebuild 14km of existing #4 ACSR 3-phase line to 3/0 and 2km of greenfield #2 ACSR to accommodate new gas plant
- Underground primary #1AL cable was trenched and drilled in conduit
- Installed 1.5MVA transformer and 3-phase voltage regulator at gas plant site
- Challenging stringing due to narrow ROW and winding alignment with multiple crossings of the existing line
Highlight:
Crews performed energized line work due to outage constraints.