Brandon LR – Structure Pole Change – 25kV
					Client: Manitoba Hydro
Location: Brandon, MB
Completion: June 2019 – Septembe 2019
Scope/Description:
- Installation and salvage of single phase 25kV on 4 networks.
 
- Work was performed using mainly live line techniques. Pre-planned outages were scheduled where live line work was not feasible
 
- Sectionalizing floaters were cut in when needed to limit affected customer outages
 
- 391 poles replaced and 325 salvaged