Pomona to Vantage 230kV Transmission Line – 230kV
					Client: Pacificorp
Location: Yakima, WA
Length: 41 miles
Completion: October 2018 – May 2020
Scope/Description:
- 330 wood pole H-frame and 25 single circuit steel monopole structures
 
- 1271 Bittern conductor with 3/8” shield wire and OPGW
 
- Re-attach existing distribution underbuild
 
- Install aerial lighting and monitoring on structures near the Yakima Training Center and Columbia River
 
- FB Titan
 
Highlight:
Two custom steel H-frame structures were installed on reinforced concrete drilled piers with ACCC conductor over the Columbia river crossing.