Pomona to Vantage 230kV Transmission Line – 230kV

Client: Pacificorp

Location: Yakima, WA

Length: 41 miles

Completion: October 2018 – May 2020

Scope/Description:

  • 330 wood pole H-frame and 25 single circuit steel monopole structures
  • 1271 Bittern conductor with 3/8” shield wire and OPGW
  • Re-attach existing distribution underbuild
  • Install aerial lighting and monitoring on structures near the Yakima Training Center and Columbia River
  • FB Titan

Highlight:

Two custom steel H-frame structures were installed on reinforced concrete drilled piers with ACCC conductor over the Columbia river crossing.