Windrise Windfarm Collector
Client: TransAlta
Location: City, State or Province: Southern Alberta
Length: 55km
Completion: Spring 2021
Scope/Description:
- Installation of underground 3/0, 750MCM, and 1000MCM cable collector cables in trefoil formation.
- Installation of direct buried fibre optic.
- Completion of power cable splices and fibre optic fusion splices.
- Installation of junction boxes.
- Completion of power and fibre cable terminations in WTGs.
- Stripping and reclamation of topsoil on collector right-of-ways.
Highlight:
Forbes completed collector installation, including trenching and backfill, at an average pace of 1000m/workday.