Brandon LR – Structure Pole Change – 25kV

Client: Manitoba Hydro

Location: Brandon, MB

Completion: June 2019 – Septembe 2019

Scope/Description:

  • Installation and salvage of single phase 25kV on 4 networks.
  • Work was performed using mainly live line techniques. Pre-planned outages were scheduled where live line work was not feasible
  • Sectionalizing floaters were cut in when needed to limit affected customer outages
  • 391 poles replaced and 325 salvaged

 