Redwater South Rail Yard Expansion – 25 kV
Client: Pembina Pipeline Corporation
Length: 3.2 km
Location: Redwater, AB
Timeline: June 2018 to December 2018
Scope/Description:
- Design, procurement, and construction of 25kV overhead power distribution and lighting systems throughout the rail yard facility
- Installation of 288 single wood poles, overhead conductor, fiber, davit arms and luminaires
- #2 ACSR primary
- Direct embedment foundations
Highlight:
Project work site had extreme space constraints due to several live railway tracks and other contractors working on site.