138kV Transmission Lines

Client: City of Medicine Hat

Length: 20 km

Timeline: March 2017 – December 2017

Scope/Description:

  • Single pole, H-frame, or 3-pole structures: 10L – 86 structures, 20L – 224 structures
  • 795 ACSR, #2 underbuild, OPGW
  • Direct embedment, culverts
  • Project scope involved uprating the existing line from 69kV to 138kV for both circuits (MH-10L and MH-20L)

Highlight: Forbes Bros procured all line materials for the project and provided material management services.

city of medicine hat We understand the difference between talking the talk and walking the walk. We know that to achieve success we have to live it and live up to it – every single day. city of medicine hat Our Mission, Vision and Values guide and align us to being the contract of choice in all markets we enter. city of medicine hat With over 2500 pieces of owned construction equipment, our capabilities are limitless. NEXT