CNRL Horizon – 240kV 

Client: ATCO Electric

Length: 6.3 km

Timeline: Energized April 2016

Location: Alberta, Canada

Scope/Description:

  • 19 steel lattice towers
  • Double circuit, twin bundle 795 Drake ACSr with ½” OHSW
  • Helical pile foundations
  • Salvage 7 km o double circuit 240kV steel lattice tower line

Highlight: Forbes Bros mobilized crews and constructed the initial 8 structures (including stringing) within 14 days due to environmental restrictions.