Edam to Golden Lake 230kV Transmission Project
Client: SaskPower
Length: 46 km
Completion Date: November 2015
Location: Saskatchewan, Canada
Scope/Description:
- 126 steel lattice towers and H-frame structures
- Single circuit, 795 ACSR Drake conductor and 3M ACCR 558 for river crossing
- Direct embedment with steel casing, and concrete caissons at the river crossing
- 5 km of steel H-frame salvage and final restoration
Highlight:
Two 330’ lattice towers were erected at the 950 m river crossing with limited access.