Edam to Golden Lake 230kV Transmission Project

Client: SaskPower

Length: 46 km

Completion Date: November 2015

Location: Saskatchewan, Canada

Scope/Description:

  • 126 steel lattice towers and H-frame structures
  • Single circuit, 795 ACSR Drake conductor and 3M ACCR 558 for river crossing
  • Direct embedment with steel casing, and concrete caissons at the river crossing
  • 5 km of steel H-frame salvage and final restoration

Highlight:

Two 330’ lattice towers were erected at the 950 m river crossing with limited access.