Keeyask 138 kV Project

Client: Manitoba Hydro

Length: 34 km

Timeline: November 2014 – April 2015

Location: Gillam, MB

Scope/Description:

  • 10 steel lattice towers, 56 steel pole structures
  • Single circuit, 2-bundle, 1033 Curlew ACSR
  • Precast concrete footings, concrete mat foundations, concrete anchors, rock anchor foundations, and helical pile foundations
  • Access for the project was almost 100km from the ROW
  • Nelson River crossing towers are 300’ structures
  • Construction activities required frozen ground conditions due to creek crossings
  • Work was completed during extreme cold weather (-45C), sever snowstorms, windstorms, and snowfalls

Highlight: At the time of project completion this project’s Nelson River crossing was the longest span in Manitoba.

keeyask

Safety is our priority, always. Every day we work to show up better than we did the day before.

keeyask With over 2500 pieces of owned construction equipment, our capabilities are limitless. keeyask We understand the difference between talking the talk and walking the walk. We know that to achieve success we have to live it and live up to it – every single day. keeyask Our Mission, Vision and Values guide and align us to being the contract of choice in all markets we enter. keeyask We understand the difference between talking the talk and walking the walk. We know that to achieve success we have to live it and live up to it – every single day. keeyask Safety is our priority, always. Every day we work to show up better than we did the day before. keeyask We understand the time, energy, and importance of selecting the right utility construction contractor.