Client: SaskPower

Project: LY15 Construction of North Saskatchewan River 138kV Lattice Tower Crossing

Location: Lloydminster, SK

Length: 1.8 km

Highlight: Conductor across 1235m river crossing span is 3 phase 3M ACCR T73 conductor with one additional spare, and 2 phases of high tension low sag OPGW fibre.  Spans adjacent to river crossing are 795 Drake ACSR with two OHSW.

Highlight: Installation of 8 pad and pier concrete foundations to support 2 new lattice towers, with rock anchors incorporated on the uplift legs of each tower. Foundation design by others.

Highlight: Approx. 235 m3 of concrete installed

This path took 40 years.

Our Mission, Vision and Values guide and align us to being the contract of choice in all markets we enter. The Forbes Bros. Group of Companies shows up ready to deliver with 40 years of experience behind us. We understand the time, energy, and importance of selecting the right utility construction contractor. With over 2500 pieces of owned construction equipment, our capabilities are limitless.
NEXT