Odessa Moss Switch (345kV)
Client: Oncor Electric Delivery
Location: Odessa, TX
Length: 52 miles
Completion Date: May 2020
Scope:
- Upgrade existing 17 miles to a 345kV transmission line requiring salvage work under daily outages
- Install new 35 miles of 345kV double circuit line
- 1926 kcmil with 2-OPGW
- Drilled concrete pier and direct embedment foundations
- FB Timberline
Highlight:
Brownfield construction required construction of a 11-mile bypass line