Sand Lake – Culberson 138kV Line
Client: Oncor
Location: Barstow, TX
Length: 57 miles
Completion: completed September 2016
Scope/Description:
- 435 double circuit concrete tangents and small angles with direct embed foundations
- 8 double circuit steel angles with anchor bolted foundations
- 35 single circuit steel full tension deadend structures with anchor bolted foundations
- 14 full tension deadends with micropile foundations
- 6 tangent structures with micropile foundations
- 1926 ACSS “Cumberland” with 48F fiber, an 3/8” shield wire
Highlight:
Initially the project included only 42 miles of line construction. The additional 15 miles were added as a separate contract.