PA4 Transmission Line Salvage & Rebuild – 138 kV
					Client: SaskPower
Length: 10 km rebuild, 7 km of salvage
Completion Date: March 2018
Location: Prince Albert, SK
Scope/Description:
- 10km rebuild (138kV) and 7 km salvage (72kV)
 
- 37 weathering steel H-frame structures and 4 guyed 3-pole weathering steel structures
 
- Replaced 4/0 Penguin conductor with single 795 Drake ACSR and two 5/16” OHSW
 
- Direct embedment, culverts, and screw pile foundations
 
- Access constraints due to swampy conditions
 
Highlight:
Forbes performed right-of-way preparation including 2 hectares of mulching (mechanical).