Pasqua to Swift Current 230kV New Line Construction

Client: SaskPower

Length: 53 km

Completion Date: March 2019

Location: Swift Current, SK

Scope/Description:

  • 182 galvanized steel H-frame and monopole structures
  • Twin bundle, 795 ACSR Drake and two ½” OHSW
  • 221 direct embedment foundations with 141 culverts, and 23 screw piles (subcontracted)
  • Line crossings over existing 138kV line and a distribution line

Highlight:

Work was completed in environmentally sensitive areas where crews were required to utilize wash stations.