Pomona to Vantage 230kV Transmission Line – 230kV

Client: Pacificorp

Location: Yakima, WA

Length: 41 miles

Completion: October 2018 – May 2020

Scope/Description:

  • 330 wood pole H-frame and 25 single circuit steel monopole structures
  • 1271 Bittern conductor with 3/8” shield wire and OPGW
  • Re-attach existing distribution underbuild
  • Install aerial lighting and monitoring on structures near the Yakima Training Center and Columbia River

Highlight: Two custom steel H-frame structures were installed on reinforced concrete drilled piers with ACCC conductor over the Columbia river crossing.

With over 2500 pieces of owned construction equipment, our capabilities are limitless. We understand and honour the relationships we make with our customers and the communities we work in. Safety is our priority, always. Every day we work to show up better than we did the day before. We look out for one another, because ultimately we are a family. Our family focus has driven safety into our core. We look out for one another, because ultimately we are a family. At The Forbes Bros. Group of Companies we are fiercely proud of our strong work ethic. NEXT