RFT 9708 60L100 Transmission
					Client: BC Hydro & Power Authority
Location: Highway 10 between 164th and 160th Street, Surrey BC
Completion Date: November 30, 2018
Scope/Description:
- All rail work.
 
- LLP pole setting on the rails due to pole heights.
 
- Environmental coordination and sensitive habitat (water shrew).
 
- Rail flatting and trail schedule coordination.
 
- Highway 10 and 168 diversion coordination with the general public.
 
- Local business and traffic diversions.
 
- Multiple rail coordination with PNR, CP, CN, and SRY Rail.
 
- FB Valley
 
Highlight(s):
- Stringing 1 – 2 km at a time over hot distribution
 
- New method for installing culverts to minimize ground disturbance and eliminate undermining railway.