Client: SNC Lavalin T&D
Length: 127 km
Timeline: September 2013 – August 2015
Location: Stavely, AB
Scope/Description:
Highlight: Linking the Foothills 237S Substation near High River to the Windy Flats 138S Substation south of Fort McLeod, the line was connected to a new capacitor station near Stavely to reduce reactive power from wind generation.