SW8 East 72kV – Structure Replacements
Client: SaskPower
Length: 26 km
Completion Date: March 2016
Location: Swift Current, SK
Scope/Description:
- Replaced 99 tangent H-frame structures, and 1 double deadend structure with direct embedment foundations
- Replaced existing OHSW and install additional shield wire
- Established winter access construction and performed snow maintenance on ROW
Highlight:
Due to the condition of the line, all work was completed under energized conditions using hot stick methods.