Tantallon Switching Station to Birtle 230kV
Client: SaskPower
Length: 25 km
Completion Date: April 2019
Location: Tantallon, SK
Scope/Description:
- New construction from the Tantallon Switching Station to the Saskatchewan – Manitoba border
- Galvanized H-frames, weathered steel H-frames, and galvanized 3-pole structures with single 795 Drake conductor
- The majority of foundations are direct embedment with several steel caissons, and culverts to accommodate sloughing.
Highlight:
To mitigate environmental impacts crews built a bridge crossing over a creek.