Western Alberta Transmission Line – 500 kV
Client: SNC Lavalin T&D
Length: 200 km
Completion Date: December 2014
Location: Rimbey, AB
Scope/Description:
- 487 steel lattice towers and 30 steel monopoles
- 4-bundle 1590 Falcon ACSR with OPGW, and OHSW
- Helical piles (by others), concrete caissons, and shallow concrete foundations
- Helicopter and conventional crane erection
- ROW preparation: brushing and clearing, and environmental and construction matting
Highlight:
The Western Alberta Transmission Line was Alberta’s first in-service direct current (dc) line transmitting electricity on the power grid.